Decks
Pressure-treated, cedar, or composite. Footings below the frost line, ledger flashed properly into the house — the two details that separate a deck that lasts from one that pulls away from the wall.
Outdoor Living · Mercer, Burlington & Ocean County
Built on footings that go below the frost line, with the permit pulled and the property line confirmed first.
Contractor Solutions builds decks, paver patios, walkways, and fencing for homes across Mercer, Burlington, and Ocean counties in New Jersey. A standard attached deck takes one to two weeks; a paver patio takes three to five days. Footings are set below the 36-inch frost line and township permits are pulled as part of the job. Licensed NJ HIC #13VH12943200, $1M insured.
Pressure-treated, cedar, or composite. Footings below the frost line, ledger flashed properly into the house — the two details that separate a deck that lasts from one that pulls away from the wall.
Excavated, base-compacted, and edged so the pavers don't migrate. A patio is 80% what's underneath it.
Front walks, side paths, and steps that meet code on rise and run — the ones people actually use in the dark.
Vinyl, wood, and aluminum. Posts set in concrete below frost, and property lines confirmed before we dig.
Recent decks, patios, and fencing are in the outdoor living gallery.
Send a photo of the yard and roughly what you're picturing. We'll come measure and put a number to it.
By starting a chat and providing your phone number, you consent to receive text messages from Contractor Solutions at that number, including estimate and appointment updates, project status updates, and occasional special offers and service promotions. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Consent is not a condition of purchase. See our SMS Terms and Privacy Policy.
Yes, in virtually every township — decks are structural and attached to the house. Fences and patios vary by municipality, and some towns regulate fence height and setback. Contractor Solutions pulls whatever permits your project needs and handles the inspections.
Below the frost line, which in central New Jersey is generally taken as 36 inches. Shallower footings heave in winter and pull the deck out of level within a few seasons. This is one of the most common shortcuts we're called out to fix on someone else's work.
Composite costs more up front and effectively ends the sanding-and-staining cycle, which is why most people choose it now. Pressure-treated wood is the lower-cost option and looks good if you commit to refinishing it every few years. Cedar sits in between and is the best-looking of the three when new.
A standard attached deck usually runs one to two weeks from first dig to final rail, plus township inspection scheduling. A paver patio typically takes three to five days depending on size and how much excavation the grade requires.
Decks and fencing, generally yes — frozen ground makes digging harder but not impossible, and winter scheduling is often faster. Paver patios and anything involving concrete or mortar are better held for temperatures that stay above freezing.